The fifth span of the dream bridge was established on the chest of the Sotwani Padma on the message of wonderful development and progress of the country. The installation of this span shows a kilometer portion of the Padma Bridge. Yesterday, on the south side of the river, the 41 meter and 42 pillars were placed on the 150 meter long span. Padma is now full of love in the new water of Ashar. But do not stop working. Workers are working day and night with sun and rain In the continuation of that work, the fifth span of the Padma Bridge is visible in Naodoba area of Jajira upazila of Shariatpur. This span is the last span on the side of Jazira end. Through this, the Padma Bridge touched the edge of Jazira. At around 8:30 am on Thursday, floating crane ships from Kumargog's special workshops jetty left the span and headed for Jazeera. In the afternoon, the span was taken to the number 41 and 42 pillar. In the evening, the span is anchored to the number 41. It was found that, from the morning, there was a drift in the Padma. In seven o'clock in the morning, the work of establishing a span on the 41 and 42 pillars of Padma Bridge began. Thousands of people have gathered in the crowd to save the time of touching the Jazira arrow in Padma Bridge. Ferries, launches and speedboats, passengers passing through the Padma, stopped the vessel and kept it in the mobile. Humayun Kabir, Deputy Assistant Engineer of the Padma bridge project, said that the 150-meter span was installed at 1:00 pm yesterday. Through this span, 750 meters of Padma Bridge is one kilometer.
0 Comments